When you click on links to various merchants on this site and make a purchase, this can result in this site earning a commission. Affiliate programs and affiliations include, but are not limited to, the eBay Partner Network.
It would be nice but untill we start work in london and the tat ŁŁŁ starts coming in so i can get my cage and wings things will be a bit slow + i still wont to put new sills on the shell thats a nuver Ł70
cars cumin on well! like the blue not sure on trhe yellow!lol
jay
Originally Posted by COLEYST200
Well Dave we have been working all day me / sam / rex in getting ready to sort were to put all that stuff for the focus so we got rid of this lot from the loft
yes they do but this is why iv been moking the car up as right behind the clocks you have a beam to mod to get the speedo cable throw then behind that the shell has i big bilt in box box section very had to get throw and the speedo cable has got to get to the N/S any way so iv run it behind the dash and heater the broke out on the N/S and straight onto the side of the sump as it a 4x4 set up
Done a bit tonight on the shell as on the way home i got some new sills as there is a bit of rot on them and the drivers side has been jacked up on a lot so that one will take a bit of time to sort out but im very happy with wot i got done to night
ITS ONLY HELD IN PLACE FOR THE PHOTO AS I NEED TO SORT A SMALL BIT OF RUST OUT FIRST BEFOR THE NEW SILL GOSE ON
Thanks mate any spair time i get im in there working on it
and it was good to chat last night sorry it was so late when you left but its all ways like that round here
Dont i know about it
I had a bollocking of the bride the last time i was popping up your's for ten mins i didnt get home till 12
still better than watching east enders and im a celebrity and i cor dance ay?
Good progres on the car M8
weld the sills on
beef up the hand break
weld up the holes were the front cradle bolt on
weld up the holes inside were the ARB bolts up
weld up the holes in the floor were the shell has plastic drain bungs
weld up the under side of the front top mounts
flash all the welds with a grinder
get a cage and weld it in but if i do it i will need a new welder
bloody hell ian you going for t45 tubing thats going to cost you mate if your going that route is there nobody you could get to tig weld it .even i didnt even think about t45 tubing as its way to expensive & i got my tube for free
Its not up to me ANDY its wot Custom Cages make there cages out of . and thats the wire they say you need to use if you mig it togever . have a look mate they do all so talk about CDS tubing
lookin really good ian wish my work was as good as yours cant wait to see the cage for it mate its gonna be insane
Thanks mate i all so hope it will look insane when its in as the one thing i wont from it is for the cage to stand out like a sore fum but in a nice way