Cheers Jamie - not long now with a bit of luck!
The list of parts to be fabricated is getting smaller and smaller. Left to do now:
- Cage
- Fuel tank
- Engine bay tanks
- Exhaust to finish
- Charge piping
- Aluminium under tray
A couple of weeks should hopefully see that lot rounded off, then it's over to a mate of mine for all the plumbing. Then need to get the wiring sorted out and get it up to RDT for tuning.
There's a glimmer of light at the end of the tunnel now