well Its been fucking mental here in the last few days,
I really wanted the Cossy kept here while the builders do the extension on the house but had nowhere to keep it out the way of them,
will let the pics do the talking for a min
little bro doing a bit!
This it what my 2 brothers together did in a day-ish
And then today I had 14.2m3 of c30 grade concrete

I hired a poker and tbh im fucking glad i did its saved us a shed load of work
we have tammped it as well of course not that the finish matters that much as im going to put down some rubber tiles because im a tart and they look nice
we ended up barrowing a fair bit(8m3) of it in as the first driver wouldnt come back past the drain and he said he couldnt get any further over to miss it

Funny how the next driver backed right up to where we needed him missing the drain by a bout 100mm
thats it for now as its pissing it down so the concrete is covered over at the mo