Originally Posted by
tabetha
I used the ARP stud and nut kit for the 2wd(10 studs) with a Yb 0611(group a) HG.
The "rest" period is 100% essential, torque up to max(with arp) then leave at least 4 hours, the retorque again.
tabetha
what do you mean retorque? and how is doing? unscrewing one by one the nuts? or check as it is?