Originally Posted by
Garage19
Lee, how many bricks would you expect that 2+1 crew to lay in a day for that rate?
Not a straight foward answer really, depends a lot on the site and design!
As a rule
200 blocks a day
or
1250-2000 bricks.
tho they have done 3000 before on a straight run.
to give an idea 10 blocks is about 1 m2