Originally Posted by Christian and Beccy
Originally Posted by rigwrecker
i usually level the bath leggs before i set the bath in place then its just a few minor adjustments when you get it in place
Christian and Beccy
so when u breaking the bath in

It was fitted for a couple of years before removing it for the revised design and what was supposed to be better pipework. Its much simpler now, but I have spent 2 evenings trying to get rid of this miniscule leak now.

aye there is nothing worse u think it has stopped then u pack up the tools and the fucker dripps again