Thread
:
Rs Turbo long term project
View Single Post
Jan 25, 2025 | 03:57 PM
#
148
boost monster
I've found that life I needed.. It's HERE!!
Joined:
Apr 2007
Posts:
1,197
Likes:
146
From:
fife
More progress on jobs that don’t really need doing. The down pipe required modifying to clear the chassis brace I fitted so my son decided to fabricate a new 3” one, I’d asked him to convert the Magnex exhaust from the inappropriately named “slip joints” to V bands. The chassis brace was designed to bolt to the inner leg but an aluminium spacer was made to tie both sides of the chassis leg together.
building myself up to change the heater matrix, a job I’m not looking forward too.
Just the Lambda bung to be welded.
This bracket bolts to the gearbox.
V band and back down to 2.5”
Chassis brace.
Aluminium spacer to tie the leg together.
Last edited by boost monster; Jan 25, 2025 at
03:59 PM
.
Reply
1
1
Canada1
boost monster
View Public Profile
Send a private message to boost monster
Find More Posts by boost monster
View iTrader Profile