Update time.
Next stage was sorting the electrics which isn't a problem as I wire complex control panels for a living so sorting out a few lights and sockets shouldnt be a issue.
Decided to use dado trunking as it's what I used in my shed before and it's pretty hard wearing did a bit of wheeling and dealing at the wholesalers and got 78% knocked off everything lol.
Total wasaround £290 for the dado , bends , couplers etc and lids.
Started to fit workshop out and planning where things are going etc
Fit some brackets for storage of pipes etc
Started wiring 240v sockets , 240v 16amp sockets for welder and 110v 16 amp sockets.
Missus said whats the single socket for , I said tv or light up ford sign lol
Ordered a ansell 2x30 led tornado light fittings x7 £100 a piece until I told them to stick it up there arses final price £32.50 each inc vat.
Fitted x6 to beams x2 per beam all on separate switches the extra one was for my welding bench but its that bright in there I couldn't see when I walked back into a dark house , very weird how led effects your eyes.
All lights on
110v centre tapped transformer mounted in control enclosure borrowed from work oh and the transformer lol, £400 worth of gear can't complain . The transformers are £220 for a 2 k va but these transformers are designed to be run constantly and not like the transformers found in the mobile plant.
Next big job was hoovering , steam cleaning the floor ready for the top coat of 2 pack epoxy floor paint.
I fucked up with the floor as I put fibres in the concrete and they were sticking up out of the floor and should of burnt them off with a blow torch instead like a knobhead I painted it and now it like having needles in you legs so when it wears down and needs new paint either they would of worn down or they will be burnt off.
All finished ready for the cupboards to come and fit for storage etc
Fetched some cabinets from b and q cost around £360 so far
Will take some more pics soon
Cheers paul