Hi just started to build my new garage or workshop as some call it lol and as I really enjoy read other people's builds I thought I would share the build with you lot.
The garage will be 7.1 m x 6.3 m with a dual pitched roof . 5 courses of brickwork the all breeze blocks which will be rendered , dual skin with 100mm insulation ( basically to current building regs for a building just in case I want to change the use or I sell the house at a later date).
Building work will take around 6 to 8 weeks.
I will put all prices up as every thread I've read people are asking how much everything is so I will try and keep it up to date.
Hope you enjoy as I can't wait to get in there lol.
Price list
Plans. £ free as I did the design work and drawings
Planning £172
Building control. £310
Labour for builder. £6950
All building supplies £4400
Rsj x4 £710
Grab lorrys. £240
Skip. £n/a
Foundations. £675
Floor slab. £800
Shutter door. £1400+
Extras. Concrete fibres £75
Tamper and float hire £130
Timber for shuttering £30
Meshmen castles. £30
Scaffolding. £380
Rendering. £ materials only as iam doing it
Plans
Cheers paul