View Single Post
Old Mar 19, 2016 | 07:43 PM
  #16  
S3an's Avatar
S3an
PassionFord Post Troll
 
Joined: Jan 2005
Posts: 3,377
Likes: 14
From: Workington Cumbria
Default

Just a little update, this week saw a lot of back filling.
Levelled ground off 13" below floor height. All by hand, no machinery. Except the whacker.

Name:  20160315_185721_zpsuykuzyd7.jpg
Views: 378
Size:  379.2 KB

Got a delivery of 10 tonne class 1 hardcore

Name:  20160317_152124_zpsvb8gjpsr.jpg
Views: 391
Size:  371.4 KB

Whackered it all down ready for the sand to go on

Name:  20160317_182853_zpsi9jsklvo.jpg
Views: 393
Size:  395.6 KB

Sand covering leaving 6" for concrete

Name:  20160318_083534_zps6xenjogk.jpg
Views: 388
Size:  451.2 KB

DPM in and reinforcing mesh down, shuttering up front



Concrete poured in

Name:  20160318_182532_zpssx1qx0g5.jpg
Views: 411
Size:  256.6 KB

Name:  20160319_082623_zpsw7qh7jkz.jpg
Views: 382
Size:  286.0 KB
Reply