So at 14:30 digging stopped and i made a call to the building control inspector, he arrives at 15:00 and passes them off. I make a quick call to the local village concrete suppliers and an hour later at 4pm it looked like this, poured directly in to the desired height. Founds ended up 2ft deep as the same as the bungalow.