View Single Post
Old Feb 15, 2016 | 03:52 PM
  #5  
S3an's Avatar
S3an
PassionFord Post Troll
 
Joined: Jan 2005
Posts: 3,377
Likes: 14
From: Workington Cumbria
Default

So at 14:30 digging stopped and i made a call to the building control inspector, he arrives at 15:00 and passes them off. I make a quick call to the local village concrete suppliers and an hour later at 4pm it looked like this, poured directly in to the desired height. Founds ended up 2ft deep as the same as the bungalow.

Name:  20160212_170118_zps8v3zz2ok.jpg
Views: 379
Size:  1.16 MB
Reply