View Single Post
Old Feb 15, 2016 | 03:38 PM
  #3  
S3an's Avatar
S3an
PassionFord Post Troll
 
Joined: Jan 2005
Posts: 3,377
Likes: 14
From: Workington Cumbria
Default

So eventually a break in the weather this week 10th Feb i decided it was time to start the project. Firstly the site would have to be cleared away and wall removed. Approximately about 100 tonne of rubble to be removed.

Name:  20160210_153612_zpse5zpmdbp.jpg
Views: 387
Size:  352.5 KB

Name:  20160210_153635_zpsgw7gjnzz.jpg
Views: 389
Size:  275.9 KB

Put up a temporary SON light just in case light was an issue through winter (didn't matter in end)

Name:  20160210_190621_zps40bdp6n7.jpg
Views: 394
Size:  279.6 KB

Name:  20160211_165035_zpsejpytpwt.jpg
Views: 396
Size:  369.3 KB

Name:  20160211_172314_zpsets0r0ua.jpg
Views: 392
Size:  353.6 KB

Name:  IMG_0561_zpsjz8jorqe.jpg
Views: 381
Size:  265.7 KB
Reply