Done some work inside.
Wired up the als valve by a switch, wired up the gear indicator and the innovative boostcontroll/bbl with safty future of boost cut if the engine goes lean.
I painted some panles in the dash and cromatized some bolts and nuts, cleaned the fusebox and checked the loom etc... thing takes time.