Stoned it up tonight.
That's about 4/5 inch below top of block which is finished floor level,
The blinded it with sand a little to stop the visquine getting punctured
Got some re-bar ordered and need to pick that up

Was meant to concrete tomorrow evening but my labour have all gone AWOL so it's Monday eve now.