Right not much done lately but did get some done yesterday.
Started to remove all the derv fuel lines and derv tank and found two of the bolt that hold the tank on just spin around so ive had to drain the tank and im leaving it a few days then filling with water to cut the bolts off (safety first lol)
while swearing at the fuel tank and kicking the shit out of it I noticed I could still pretty much do all the undersealing so the car now has been undersealed 95% (under front sub frame and fuel tank legs not done), While under the car I only found one spot of rust thats just on a silly flap for the wheel arch liners so when I cut the tank out ill cut the flap off and paint with anit rust paint.
Also all the cars wiring is now sorted with power getting to everything as it should.
Also ive remove nuts and top plates from the front and rear shocks so there near enough ready to come off.
List of things left to do.
Cut of fuel tank
remove last of fuel lines
cut off rust
remove derv engine and gearbox
remove whole suspension
fit engine with gearbox
fit new front suspension and brakes and wheels
remove rear suspension off mk4 and fuel system
remove mk5 rear suspension and refit mk4 suspension
refit petrol fuel system
fit coolant system
fill engine gearbox brake system and coolant system up with fuilds
connect engine harness to main enginebay loom
Fit cat back exhuast.
fit side skirts
cut off old front bumper
refit new front bumper
refit gear linkage
buy mk5 pedalbox
buy mk5 headlights
buy mk5 front upper grill
buy replacement pas shock
buy replacement clutch realse bearing
fit that lot
insure car
send car for mot to fail lmfao
book trackday.
oh and do all of it over the next two weeks lmfao.
Last edited by Straight_4_N/a; Jun 2, 2014 at 04:29 PM.