Got the engine and stuff fitted today along with suspension.. rs2000 brakes and braided hoses. Next is fitting the loom an making sure the air con works. Few pics
Intercooler fits nice with the rads just got to work out a route of the pipe work as the engine is mighty tight for space..
Thanks for looking.