While i was waiting for rack to dry i popped down to burton power and picked up some heat matting so can line the bulkhead transmission tunnel as the original heat proofing had perished over time so removed all that ready for the new stuff.
All the old perished heat proofing removed
Hour later all fitted on was easier to apply then what i was expecting.
Once engines in and bay is all complete alot of this wont be seen but it looks alot more fresher now that the heat proofing and replacement bulkhead panel is all in now.