The farmer lent us his digger and swapped his 5 ton trailer whenever we had filled it and I already had the mixer, so far we have dig down to foundation level and poured the foundation hopefully this weekend we have us to over site level with the brick/block so we can start filling around the perimeter as the digger has gone back for a week or so and the garage is only half dug if that and there is 10 ton or soil on the drive ready to go