the diff tunnel is just tacked in as bothe sides of it il replace the lot with new steel and its going to have link boxes
like I say im removing the floor from the new floor pan back as I didn't like patching it
extended this side the tunel as I need make the hole centre section but have a folder there
last job I was on with that day was start remove floor section ,this is were I left it
my good mate rang me say to 8x4 sheets off steel turned up so I can roll the tubs an swage them ,as I say its only when I get free time witch isn't very often these days cheers