Not at all James, it's pure distraction from the bullshit at work lately, not the best bricklayer but it ll stay standing lol
Coastwise so far has been 200 for ready mix for the foundation, I'm using the side of the existing shed and the back wall so I only needed one foundation for the left hand wall u see, blocks so far were 250 and sand and cement about the same, I'm about a grand in so far adding the digger guy.
All that's left will be the timbers for the roof and the roof itself which I plan on using are the PVC metal type sheets