gonna pop one of those thick plastic sheets to seperate the dolly and cement (notice the professional term " one of those thick plastic sheets", i know my shit, oh yes,

). the dolly was a straight £200 for 7.5t, the cement next week is rolling in at £98 per cubic metre, and i need 4.5ish for a 5 inch base, with vat and a little dumper thing (yet another professional term) its gonna be £550. so far im £300 over budget just on the base, haha, all the timbers ordered @ £1000 for 1/2 inch shiplap and a 3x2 frame, jus gotta pay for it, should have enough to do it all, hopefully.