View Single Post
Old Mar 27, 2011 | 12:50 AM
  #7  
dawesy1700's Avatar
dawesy1700
JAPSCORT
 
Joined: Aug 2009
Posts: 484
Likes: 2
From: darlington
Default

so the 7.5T of dolomite arrived at dinner time and we started to lay it down.



the tire tracks were made by a 2.5t transit tipper, so it gives you an idea of the scale whens theres plenty of room down either side if it was parked inside



and this what the lads thought of me pissing off to take a better pic, haha


then a pair of tarpaulins to help keep it dry till next weeks 10T of ready mixed cement can be delivered, gonna be great.

Last edited by dawesy1700; Mar 27, 2011 at 12:52 AM.
Reply