Cheers guys..
Dropped my daughter off at school this morning and got out the workshop to get cracking on with it..
Got on pretty well with it i think.. Haven't done this to a escort or any water cooled car about 10 years come to think of it..
Got all the wiring, pipe work, rad intercooler ect out the way. Then disconnected everything else and whipped the engine and box out..
So then i dug out my roll over frame and got it bolted on ready.
Then got all the glass, interior ect out of the car and set about rolling it over.
It only took 2 hours to get it to this stage, well happy with myself thought it would of took me all day as it's been along time since touching one..
Then off with the exhaust, gear seletor, fuel tank, pipes, pump and brake lines. And started cleaning the underneath up ready for painting..
So tomorrow i'l be whipping the O/S suspension off and finish cleaning the underside..