taken the car 2 work 2 day so i can do all the panel work
started on the n/s inner sill,
got 2 cut out an replace all the rust b4 i replace the panel!!
2moz goin2 remove an replace the rust from the front bit were the inner sill fits!!
then spot weld the inner sill in place at the top as sides ready 4 the floor!!!!
then on 2 the other side!!!
jamie