Yeah, as said a real half an hour will do a decent job with tracking internal cables etc.. The only time consuming part is putting the mobo fittings onto the case, matching the led, power connectors, usb (if seperate pins) onto the mobo. Obviously if buidling a high spec system with water cooling, fan speed controls, Raid setup it will take longer.