Originally Posted by
rickbartlett
as above

exactly, CJ Bartlett, you just block off the reservoir holes, and remove the pipes going from the reservoir to the modulators, then remove the lower pipes on the t pieces going to the modulators, either side. You then manufacture 2 pipes going from each t piece and then put them into the master cylinder.
You can then cut the abs belts and remove them, then remove the modulators.. It really is simple mate, it sounds and looks harder than it actually is!
Let us know how you get on matey!