View Single Post
Old Jul 26, 2008 | 11:44 AM
  #6  
matthart's Avatar
matthart
Regular Contributor
 
Joined: Jun 2006
Posts: 302
Likes: 9
From: Chelmsford
Default

The CPS does fit throught the hole and seems to line up with the flywheel cutouts so I can only assume its actually an MFI block and its been drilled by someone else.

I'm not too good with metal or a welder but I've knocked this up:



Bolts through from the gearbox side into a welded nut, and then the CPS itself is attached with a nut on a welded bolt.
Looks loose in that picture, but when tightened up the cps sits about 1mm away from the flywheel in line with the cutouts. How can you test a cps signal?

Cheers!
Reply