i used the rs2k one, took zetec and box out together, used the zetec flywheel on the rs lump, mated that to a diesel mk4 gearbox brought them up from underneath to find that i would need to cut the whole engine mounting bracket off the car and grind it back then weld in a new plate in the correct position and make up some supports for it. also had to space the gearbox cradle about 10mm with some spacers, did the same with the anitroll bar and gear linkages so that whole engine and box assebly was low engough for the bonnet to shut propperly. doing the loom tomorrow with my mate then gotta make an exhaust system up and underseal inside the drivers side front suspension turret as whel welding it melted away all the bodysealer and paint. there are pics and more of an explinations that in "members projects" on s2rs.co.uk ( i use the same username)