hi guys just had my drive tarmaced, not by pikeys

but reputable firm , all along the work was spot on, good base dug out, decent hardcore etc then good base of tarmac, but when it came to laying the topcoat it was laid in 2 halfs and you can see a noticable join down the middle

is this the norm as it really lets the job down ,and i,m going to complain ,but i need to get some facts first,
drive is 8 metres by 8 metres by the way