Get two snapped studs spark eroded out of the head...
Get 1 snapped stud out of the turbo
Build up the motor with new grp A gasket etc
Ultrasonically clean and flow test the injectors
Fit exhaust system
fit new front discs and pads
Drain fuel tank of stale fuel
Get running and set up fuelling etc
Mot and Tax
Valet
Etc,etc,etc(Must be loads more i missed

)
Car has been laid up for 14 months so i`m sure there will be more minor bits...
This is the 4x4 by the way,the escos is sorted....