View Single Post
Old Jun 28, 2006 | 08:41 PM
  #8  
nellyscossy's Avatar
nellyscossy
Too many posts.. I need a life!!
 
Joined: Apr 2006
Posts: 770
Likes: 0
From: birmingham
Default

the filling loop i described wont be connected to the actual boiler it should be just underneath on the connecting pipework usually about 10" or so below
Reply