you need to find your filling loop(usually a flexy braided hose with a small tap or two on it)
then fill the system till the gauge reads 1.5
the filling loop will be connected between a 22mm pipe and a 15mm pipe
and it should be close to the boiler usually directly underneath but depends who fitted it and when youve done that make sure the tap(s)you have opened are closed again properly