Series 2 Cossie management conversion
6 Attachment(s)
Been off her for a while, I've decided to do a Cossie management conversion I've got all the parts and gadget has been doing the work for me, his work is faultless! As pics will show.
Attachment 31395 Attachment 31396 Attachment 31397 Attachment 31398 Attachment 31399Attachment 31400 |
1 Attachment(s)
That's the old loom removed and cambelt and water pump off for new ones!
Attachment 31394 Old gunky water pump. More pics to follow tonight, some impressive work to be shown. |
will watch this closely as fancy doing it on mine
|
Can"t wait to see more..
|
5 Attachment(s)
More pics...
Attachment 31387 Attachment 31388 Loom in ready for cutting and lengthening etc Attachment 31389 Loom stripped for cutting etc Attachment 31390 Camshaft trigger bracket. Attachment 31391 New waterpump and tensioner |
6 Attachment(s)
Attachment 31381 New pro alloy rad and fan kit.
Attachment 31382 Alternator loom made up as my old was shoddy Attachment 31383 Attachment 31384 Fans wired in. Attachment 31385 Inlet all sprayed up. Attachment 31386 Fuel filter relocated. I used a ka one for neatness |
4 Attachment(s)
Attachment 31377
Coil relocated Attachment 31378 Cambelt cover finished and cam sensor fitted. Attachment 31379 Btm inlet with greens fitted! Attachment 31380 Loom braided and labeled. |
7 Attachment(s)
|
Looking good.
|
very smart this! work is very tidy ! nice one!
|
Awesome work.
|
Gadgets work is faultless!
|
Trying to upload a latest engine bay pic, but can't upload it
|
looks a clean machine mate. how are you enjoying efi?
|
All times are GMT. The time now is 12:06 PM. |
© 2024 MH Sub I, LLC dba Internet Brands