new garage build
#42
Regular Contributor
Thread Starter
so things are moveing on we are up to full hight now just a bit of brick work to finsh off over the back door and stuff
digger should be back tomorrow to start on the summer room
so tomorrow this should be coming down
digger should be back tomorrow to start on the summer room
so tomorrow this should be coming down
#44
Regular Contributor
Thread Starter
so more done started on the back room today did have a wee miss hap
dont think water is supposed to be coming from there
conservatory gone
brick work on lintel done
more digging
dont think water is supposed to be coming from there
conservatory gone
brick work on lintel done
more digging
#45
Regular Contributor
Thread Starter
so bit off a nightmare over the last cpl off days
1st of friday morning the skip wagon turns up dropped 2 skips in the road the was just about to lift up the full skip and it had no lift so they had to ring for a Mechanic to come out he tried every thing but nothing work so ended up at 1 pm they had to drive back to there depot with the host down like this
by then we had lost a few hrs work as the dumper could not get round the truck not that he could put the stuff anywhere any way so a 2nd skip wagon turd up to move and takeaway the skips
then as we was digging the foundations we ran in to 2nd problem some 1 had concreted over a man hole not good phone call to building inspector coulden get here till yesterday had to dig an extra foot wide to take the soil pipe past where the founditions are this is where the man hole cover was
so now we have foundations in
should have some delvers this week more brick and sand and also timber and roof tiles for the garage
1st of friday morning the skip wagon turns up dropped 2 skips in the road the was just about to lift up the full skip and it had no lift so they had to ring for a Mechanic to come out he tried every thing but nothing work so ended up at 1 pm they had to drive back to there depot with the host down like this
by then we had lost a few hrs work as the dumper could not get round the truck not that he could put the stuff anywhere any way so a 2nd skip wagon turd up to move and takeaway the skips
then as we was digging the foundations we ran in to 2nd problem some 1 had concreted over a man hole not good phone call to building inspector coulden get here till yesterday had to dig an extra foot wide to take the soil pipe past where the founditions are this is where the man hole cover was
so now we have foundations in
should have some delvers this week more brick and sand and also timber and roof tiles for the garage
#50
Regular Contributor
Thread Starter
bit more done today 1 more steal in brick work done and some timber fitted and loads cut ready to fit tomorrow
also had the roller door man round to measure up for the door
also been to see about scissor lift orderd 1
also had the roller door man round to measure up for the door
also been to see about scissor lift orderd 1
#52
10K+ Poster!!
Get the ramps sunk in the ground mate, they get in the way if not, I used mine for more than a yr and was a pain putting a car away over them, it is a total luxury now they are in the base of the garage,
I have the same ramps
I have the same ramps
Last edited by Caddyshack; 11-05-2017 at 05:42 PM.
#53
Regular Contributor
Thread Starter
#54
Regular Contributor
Thread Starter
well some slow progress but we are geting there
in this pic u can see a window boarded up the window company forgot to inform us that there was a delay in the window after we had taken the window out
and this got fitted today well happy with it
in this pic u can see a window boarded up the window company forgot to inform us that there was a delay in the window after we had taken the window out
and this got fitted today well happy with it
#57
PassionFord Post Whore!!
Thats a great garage.
Coming along very well
Coming along very well
#59
Advanced PassionFord User
Hi mate what floor paint did you use , I've gone for epoxy 2pack and they say it cannot be painted on damp concrete and they say it's 1 month for every 25 mm on concrete drying time otherwise it will bubble and peel off.
That's 6 months waiting time lol.
Cheers paul
That's 6 months waiting time lol.
Cheers paul
#60
Regular Contributor
Thread Starter
Hi mate what floor paint did you use , I've gone for epoxy 2pack and they say it cannot be painted on damp concrete and they say it's 1 month for every 25 mm on concrete drying time otherwise it will bubble and peel off.
That's 6 months waiting time lol.
Cheers paul
That's 6 months waiting time lol.
Cheers paul
#61
Regular Contributor
Thread Starter
well the roof is nearly done forgot to get pics as i have been painting all day any 1 whos paint block work will know how much a **** job that is need to get some more paint as i well under estimated how much i need
also built up some wall cabinets also for got pics off them
also built up some wall cabinets also for got pics off them
#62
Advanced PassionFord User
well the roof is nearly done forgot to get pics as i have been painting all day any 1 whos paint block work will know how much a **** job that is need to get some more paint as i well under estimated how much i need
also built up some wall cabinets also for got pics off them
also built up some wall cabinets also for got pics off them
Lol , I know how you feel mate been painting mine for nearly 3 weeks , first the walls I used sandtex mansonary paint and I took 70 litres . Then I decided to paint the beams , used direct to rust hammerite paint went on great but in the morning I looked and there was all rust spots all over so painted them again and ran out of paint, got a small tin touched up and paint half the centre beam only to look in the morning and it was like a cream colour so painted everything again , and then today I painted the floor with a thinned down coat and still got the top coat to go on .
I like painting but the garage is starting to take the piss lol
Cheers Paul
#64
DECODING JIBBA JABBA!!
did my old garage many years ago using a spray gun, diluted some dulux masonry paint and sprayed away.
did an entire single garage in less than an hour.
did an entire single garage in less than an hour.
#66
Regular Contributor
Thread Starter
more done had to swap all my stuff in to my new garage over the weekend
then builders was back today to start on old garage block old windows up and dig footings
then builders was back today to start on old garage block old windows up and dig footings
#67
Regular Contributor
Thread Starter
#70
PassionFord Post Whore!!
It's looking good
Put some lights down the walls... makes a massive difference when working on cars
Put some lights down the walls... makes a massive difference when working on cars
#72
Regular Contributor
Thread Starter
had a bit off a rethink with my shelving so moved it to the back end off the garage
how it was
now
lots more room at the front now
also puting a loft space in now here you can see where the shelving is now and the new loft
will give me lots more room also going to move my compressor up in to the roof some where
how it was
now
lots more room at the front now
also puting a loft space in now here you can see where the shelving is now and the new loft
will give me lots more room also going to move my compressor up in to the roof some where
#77